Innovative Solutions · Hyderabad Traffic

2-Wheeler Only Flyovers, built from prefabricated steel

Most of the vehicles queuing at Hyderabad's junctions are two-wheelers. Edvenswa EPC's Two-Wheeler Deck Junction gives them their own elevated, signal-free deck, built from factory-made steel modules so a junction can be finished in about 3 months at a very low cost compared with a conventional concrete flyover.

~3 months

construction time per junction

Prefab steel

factory-made, bolted on site

0 signals

for two-wheelers on the deck

Low cost

compared with a concrete flyover

See it in action

Live traffic simulation. Switch views, ride along with a two-wheeler, or change the traffic volumes.

Loading 3D model…

A solution by Edvenswa EPC Pvt Ltd

Two-Wheeler Deck Junction

Two-wheelers ride steel ramps up to an elevated deck, circle the island and peel off to any arm without meeting a signal. The ramps and deck stand on single steel columns, so the ground below carries four car lanes each way into the junction, run on conventional signals.

Deck and steel ramps · two-wheelers, no signals
Ground · cars, 4 lanes each way, signal-controlled

Why start with two-wheelers?

Taking two-wheelers out of the signal queue frees up the junction for everyone else, without the cost and years of disruption of a full flyover.

Two-wheelers dominate the queue

Two-wheelers make up most of the vehicles waiting at Hyderabad's signals. They fill every gap, spill across lanes and slow down cars and buses behind them.

Every vehicle waits for every signal

At a four-arm junction each approach gets a short green and then waits through three other phases. A single signal cycle can hold a rider for over a minute.

Conventional flyovers take years

A reinforced-concrete flyover typically takes years to build, needs heavy foundations and keeps the junction choked with barricades for the entire construction period.

How the junction works

1

Ramp up from the median

Two-wheelers keep to the median lane and ride up a steel ramp, no steeper than 7.5%, to a deck 7 m above the road.

2

Signal-free ring on the deck

On the deck, riders circle a central island clockwise and merge like a roundabout. No signals, no waiting for a green.

3

Peel off to any arm

Go straight, turn right or take a U-turn round the island, then ride down the ramp of the arm you want. Left turns use a free slip lane.

4

Cars and buses flow below

The ramps stand on single steel columns, so the road beneath them becomes an extra car lane: four lanes each way into the junction, on conventional signals, with far fewer vehicles in each queue.

Why prefabricated steel?

The deck is designed as a kit of steel modules. Most of the work happens in a factory, not on the road, which is what makes a roughly three-month build possible.

Built in a factory

Deck, ramp and column modules are fabricated off-site to precise dimensions while foundation work goes on at the junction in parallel.

Bolted together on site

Modules are lifted into place and connected rather than cast in situ, so erection can be planned in short night-time windows.

Single columns, open underneath

Ramps and deck stand on one line of slim steel columns in the median, so the space under the ramps is reclaimed as an extra car lane instead of being walled off.

Very low cost

A lighter steel structure on single columns means smaller foundations, less material on site and a much shorter construction period than a concrete flyover.

Can be relocated

Because the structure is bolted rather than cast, modules can be dismantled and re-erected at another junction if traffic patterns change.

Minimal disruption

With most of the work done in the factory, barricades are on the road for weeks rather than years.

From start to opening in about 3 months

An indicative programme for a typical four-arm junction, once approvals are in place.

  1. Month 1

    Survey, design and fabrication

    Traffic and site survey, structural design of the modules, and factory fabrication begins.

  2. Month 2

    Foundations in the median

    Column foundations are laid in the median while the steel deck and ramp modules are completed in the factory.

  3. Month 3

    Erection and opening

    Steel columns, ramps and deck are lifted in and bolted together, followed by crash barriers, surfacing, lane markings and opening.

Who benefits

Two-wheeler riders

No signals and no stopping at the junction. Riders keep moving and are separated from heavy vehicles.

Car and bus users

Shorter queues at the ground signals, because most of the vehicles that used to share them are now on the deck, plus an extra lane each way under the ramps.

The city

A fast, low-cost way to relieve congested junctions, with less pollution from idling engines and far less construction disruption.

Bring a Two-Wheeler Deck Junction to your city

We would welcome a conversation with city authorities, urban planners and infrastructure partners about piloting a prefabricated two-wheeler deck at one of Hyderabad's busiest junctions.

Edvenswa EPC Logo

Edvenswa EPC

Building trust through quality construction and project excellence, delivering sustainable infrastructure and innovative solutions.

Building with Integrity.

Shaping with Excellence.

Edvenswa EPC is a trusted leader in Engineering, Procurement, and Construction with expertise across India. From civil & structural works to industrial projects, we deliver sustainable infrastructure solutions with precision and innovation.

© 2026 Edvenswa EPC. All rights reserved.