Innovative Solutions · Hyderabad Traffic
2-Wheeler Only Flyovers, built from prefabricated steel
Most of the vehicles queuing at Hyderabad's junctions are two-wheelers. Edvenswa EPC's Two-Wheeler Deck Junction gives them their own elevated, signal-free deck, built from factory-made steel modules so a junction can be finished in about 3 months at a very low cost compared with a conventional concrete flyover.
~3 months
construction time per junction
Prefab steel
factory-made, bolted on site
0 signals
for two-wheelers on the deck
Low cost
compared with a concrete flyover
See it in action
Live traffic simulation. Switch views, ride along with a two-wheeler, or change the traffic volumes.
A solution by Edvenswa EPC Pvt Ltd
Two-Wheeler Deck Junction
Two-wheelers ride steel ramps up to an elevated deck, circle the island and peel off to any arm without meeting a signal. The ramps and deck stand on single steel columns, so the ground below carries four car lanes each way into the junction, run on conventional signals.
Why start with two-wheelers?
Taking two-wheelers out of the signal queue frees up the junction for everyone else, without the cost and years of disruption of a full flyover.
Two-wheelers dominate the queue
Two-wheelers make up most of the vehicles waiting at Hyderabad's signals. They fill every gap, spill across lanes and slow down cars and buses behind them.
Every vehicle waits for every signal
At a four-arm junction each approach gets a short green and then waits through three other phases. A single signal cycle can hold a rider for over a minute.
Conventional flyovers take years
A reinforced-concrete flyover typically takes years to build, needs heavy foundations and keeps the junction choked with barricades for the entire construction period.
How the junction works
Ramp up from the median
Two-wheelers keep to the median lane and ride up a steel ramp, no steeper than 7.5%, to a deck 7 m above the road.
Signal-free ring on the deck
On the deck, riders circle a central island clockwise and merge like a roundabout. No signals, no waiting for a green.
Peel off to any arm
Go straight, turn right or take a U-turn round the island, then ride down the ramp of the arm you want. Left turns use a free slip lane.
Cars and buses flow below
The ramps stand on single steel columns, so the road beneath them becomes an extra car lane: four lanes each way into the junction, on conventional signals, with far fewer vehicles in each queue.
Why prefabricated steel?
The deck is designed as a kit of steel modules. Most of the work happens in a factory, not on the road, which is what makes a roughly three-month build possible.
Built in a factory
Deck, ramp and column modules are fabricated off-site to precise dimensions while foundation work goes on at the junction in parallel.
Bolted together on site
Modules are lifted into place and connected rather than cast in situ, so erection can be planned in short night-time windows.
Single columns, open underneath
Ramps and deck stand on one line of slim steel columns in the median, so the space under the ramps is reclaimed as an extra car lane instead of being walled off.
Very low cost
A lighter steel structure on single columns means smaller foundations, less material on site and a much shorter construction period than a concrete flyover.
Can be relocated
Because the structure is bolted rather than cast, modules can be dismantled and re-erected at another junction if traffic patterns change.
Minimal disruption
With most of the work done in the factory, barricades are on the road for weeks rather than years.
From start to opening in about 3 months
An indicative programme for a typical four-arm junction, once approvals are in place.
Month 1
Survey, design and fabrication
Traffic and site survey, structural design of the modules, and factory fabrication begins.
Month 2
Foundations in the median
Column foundations are laid in the median while the steel deck and ramp modules are completed in the factory.
Month 3
Erection and opening
Steel columns, ramps and deck are lifted in and bolted together, followed by crash barriers, surfacing, lane markings and opening.
Who benefits
Two-wheeler riders
No signals and no stopping at the junction. Riders keep moving and are separated from heavy vehicles.
Car and bus users
Shorter queues at the ground signals, because most of the vehicles that used to share them are now on the deck, plus an extra lane each way under the ramps.
The city
A fast, low-cost way to relieve congested junctions, with less pollution from idling engines and far less construction disruption.
Bring a Two-Wheeler Deck Junction to your city
We would welcome a conversation with city authorities, urban planners and infrastructure partners about piloting a prefabricated two-wheeler deck at one of Hyderabad's busiest junctions.